Company Logo
  • Products / Services
  • CO₂ Reduction
  • Glass
  • Aluminium and Alumina
  • Copper
  • Boiler
  • Cement & Minerals
  • Chemical
  • Hydrocarbon
  • Incinerator
  • Nonferrous Metals
  • Steel
  • Refractory
  • Other Industries...
  • Equipments
  • HV-1500
  • HV-3000
  • HVO-3600
  • Six Way Console
  • Water Recycling System
  • About Us
  • History
  • CEO Message
  • Meet the Team
  • Legal Notice
  • Privacy Policy
  • Home
  • Downloads
  • References
  • Contact Us
  1. Home
  2. Products & Services
  3. Glass
  4. End Fired Furnace
  5. Air Fuel Combustion
  6. Burner Development

R&D - Burner Development

Regulating Gas Burner Development Image One

Stay ahead of industry standards and regulations with our services that align with the latest guidelines, keeping your operations compliant and future-ready.

  • R&D since 1992
  • Continues investment
  • Latest 3D CAD and simulation
  • Trial runs on test furnaces

Since the early 1990, Hotwork put major efforts into research and development, being continuously involved in both publicly funded research projects and internal R%D. Today, almost 20 years later, R&D is still part of our daily lives. New regulations require us to refine and tune our products, improving them more and more. High energy prices lead to the need for reduced fuel consumption.

New CAD software enables us to not only generate 3D models of our products. Using integrated simulation systems, we are able to validate new products before they are installed in a client’s furnace. Hotwork and UAS specialize in the supply of auxiliary equipment, including full gas control stations, furnace control systems (DCS), full automation, exhaust gas analysis and oxygen probes as well as tuning, supervision and commissioning services worldwide.

Regulating Gas Burner Development Image Two

After our new product was successfully developed and tested using 3D CFD simulations, we were able to run a series of experimental investigations on a test rig of Gas- und Wärme-Institut Essen e. V. (GWI) in Essen, Germany. This test furnace offers boundary conditions very close to those found in industrial glass melting furnaces while also providing maximum accessibility for various measurement techniques. With air preheating available up to 1350°C and burner powers of up to 1.25 MW, this test rig provides a very realistic testing environment for underport, sideport and throughport burners. In the latest experimental campaign, a preheating module and burner for oxyfuel combustion was tested.

Hotwork International Thailand

96 Soi Vorapong
Samsen Rd.,Banpanthom 
Pranakorn, Bangkok 10200
contact@hotwork.co.th+66 81 803 5995

Hotwork Group

  • Hotwork Holding AG
  • Hotwork International AG
  • Hotwork International Inc.
  • Hotwork - XiX Ltd
  • MPOT Hotwork Solution Ltd
  • IRSP Ltd
  • Hotwork Heat Treatment & Specialized Services Ltd.
  • Heat Up Latin America S. DE R.L. DE C.V
  • PT Hotwork International Indonesia
  • Heat Applications India Ltd.
  • Heat Applications Global Ltd.
  • Total Project Management Ltd.
  • Hotwork International South America S.A.,
  • Hotwork International Co. Ltd. (Thailand)
Company Logo  Footer

Copyright © 2025 Hotwork International Thailand  |

This website uses cookies to ensure you get the best experience on it. By using this website, you agree to the cookies terms.

Read more.Dismiss